Built for Victorian Builders · Australia

Stop doing
paperwork
at 10pm.

Victorian builders use Nexxt to get compliance-ready documents done on site — in 60 seconds.

❌ Progress claim the old way3–4 hours
✔ With Nexxt Site Manager60 seconds
❌ NCC check — call certifier, wait 2 days2 days
✔ With Nexxt Site ManagerInstant
❌ Defect variation order — manual write-up45 mins
✔ With Nexxt Site Manager60 seconds
❌ Trade plan breakdown — highlight & print3 hours
✔ With Nexxt Site Manager2 minutes
SOP Act–format progress claims in minutes
All NCC building classes 1a through 10c
Defect log → formal variation order in one tap
SWMS — drafted to WorkSafe Victoria requirements
EOT notice — protect from liquidated damages
Upload plan PDF → 9 trade packs in sequence
Built by construction professionals who know what Victorian sites actually need.

How It Works

Built for real construction workflows in Victoria.

1

Choose a Tool

17 AI-powered tools built specifically for Victorian builders and site supervisors.

2

Describe the Job

Type or speak in plain English. Voice recording on site diary. AI formats everything professionally.

3

Get Instant Documents

Professional, compliance-ready documents ready to download, email or send to your subbie.

17 Tools. Every Stage of the Build.

From the first plan upload to the final handover — every document a builder needs.

See it in 30 seconds

Watch a real builder use Nexxt on site.

Progress claim, SWMS, plan reader — on the phone, before smoko.

New tool walkthroughs
every day on TikTok

Progress claims, SWMS, plan reading and more — two new videos daily.

Follow on TikTok
@nexxtsitemanager
Why we built this

Built for the supervisor still writing claims at 10pm.

Victorian site supervisors were spending hours on paperwork that should take minutes. Progress claims at 10pm. SWMS from scratch every job. We built Nexxt to fix that — compliance-ready documents, on site, in under 60 seconds.

Join Victorian builders already using Nexxt.

From metro Melbourne to regional Victoria — on a Ringwood job site at 6am, on a Geelong slab pour, in a Bendigo site shed.

Melbourne Ringwood Geelong Ballarat Bendigo Shepparton Traralgon Mildura Warrnambool
What builders say

From the site shed and the ute, not a focus group.

We’re in pilot — real builder quotes coming soon. We’d rather show you nothing than make them up.

Pricing

Simple, transparent pricing for builders of all sizes.

Free
$0/mo
Try it on one job
  • ✓ Daily Supervisor + live "good catch" alerts (1 project)
  • ✓ All AI document tools (5/month)
  • ✓ PDF download
  • ✗ Unlimited documents & your branding
  • ✗ The money loop & compliance gate
Supervisor
$39/mo
Paperwork, sorted
  • ✓ Unlimited AI documents
  • ✓ Your logo + no watermark, full history
  • ✓ Up to 3 projects
  • ✓ Plan Reader & Trade Splitter (fair-use)
  • ✗ The full AI site supervisor →
Business
$179/mo
For a crew across multiple jobs
  • ✓ Everything in Builder
  • ✓ Team logins + multi-project portfolio
  • ✓ Custom brand colours + API
  • ✓ Unlimited Plan Reader & Trade Splitter
Side by side
Feature Free Supervisor
$39/mo
Builder
$89/mo
Business
$179/mo
AI documents per month5UnlimitedUnlimited
Active projects13Unlimited
Subcontractor register5 subsUnlimitedUnlimited
Your logo + document history
Plan Reader / Trade Splitter (per month)1 / 05 / 2Unlimited
Variations & payment claims — the money loop
Compliance gate — catches uninsured subbies
Inspections + compliance/audit-record PDF
AI morning briefing + supervisor seats
Team logins, portfolio, custom brand + API
FAQ

Straight answers

Is Nexxt Site Manager legal advice?

No. It is an advisory tool — every document it generates is a draft for your review, built to the relevant Victorian formats. It never replaces your building surveyor, your lawyer or the Act itself.

Does it work on site with poor reception?

Yes — the site-capture tools keep working offline. Site instructions, inspections, RFIs and defect photos save on your phone when you have no signal and sync automatically when reception returns.

Where is my data stored?

In a managed PostgreSQL database protected by row-level security, so each account can only ever see its own records. The Security page lists the full stack, data locations and subprocessors.

Is it only for Victorian builders?

It is built Victoria-first — the Security of Payment Act 2002 (Vic) including the 2026 reform, WorkSafe Victoria SWMS requirements and the NCC as adopted in Victoria. Other states are on the roadmap.

What changed under the SOP Act 2026 reform?

From 15 April 2026, reference dates were abolished (claims run monthly), payment terms are capped at 20 business days, and respondents get a 5-business-day second chance to issue a payment schedule. Nexxt's deadline engine already reflects the reform — always verify against the Act for your own contract.

How much does it cost?

There is a free plan — 5 AI documents a month on one project. Paid plans start at $39/month (Supervisor) for unlimited documents; the full AI site supervisor is $89/month (Builder).

Start Using Nexxt Site Manager Today

Save time. Stay compliance-ready. Get paid faster.

Dashboard
VIC Builder Tools
Beta

G'day, Builder 👋

Your AI-powered site management hub for Victorian construction.

Your Builder Profile Auto-fills all documents
AI Uses Left
5
Free tier · resets monthly
Tools Available
17
AI-powered
Subcontractors
0
In register
⚠️ Advisory Notice: All AI outputs are advisory only. Not legal advice. Always verify with qualified professionals.

Progress Claim Generator

Generate progress claims built to the Security of Payment Act 2002 (Vic) format for Victorian construction projects.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.
AI-assisted draft. This produces a draft progress claim to review — not legal advice. Verify every figure, date, GST amount and SOPA clause, and confirm your obligations, before relying on or serving this claim. Terms

Claim Details

Generated Claim

Fill in project details and click Generate
⚠️ Legal Notice: Draft template only. Have a qualified professional review before serving. Not legal advice.

Defect & Variation Log

Describe the defect or issue in plain English — get a formal variation order ready to send.

Defect Details

Variation Order

Describe the defect and click Generate
⚠️ Note: Not legal advice. Always try to agree variations in writing — it is best practice and avoids disputes. However, under the Security of Payment Act 2002 (Vic) (as amended in 2026) a variation that was not agreed in writing may still be claimable, and delay and latent-condition costs are no longer "excluded amounts". Don’t assume an un-signed variation can’t be claimed. Indicative — verify against your contract and current legislation.

SWMS Generator

Generate a Safe Work Method Statement drafted to WorkSafe Victoria requirements. Describe the task — get a complete SWMS.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.

Task Details

Safe Work Method Statement

Select work type and describe the task
⚠️ WorkSafe Victoria Notice: Under the OHS Regulations 2017 (Vic), a SWMS for high risk construction work must be reviewed by a competent person and signed by all workers before that work commences. AI-assisted draft only — review with your safety officer; not a compliance determination.

NCC Compliance Checker

Plain-English NCC 2025 reference guidance with risk assessment — confirm with your surveyor. All building classes 1a through 10c.

Reference only — points to publicly available NCC provisions. Confirm with a registered building surveyor.
AI-assisted guidance — not a compliance determination. This is an aid, not legal or building-surveying advice. Always confirm requirements against the current National Construction Code or with a registered building surveyor before relying on them. Terms

Your Question

Compliance Assessment

Submit your compliance question
⚠️ Advisory Only: General guidance only. Verify with a registered building surveyor. Check NCC 2025 at abcb.gov.au.

Site Diary AI

Speak or type your raw site notes — AI turns them into a structured, legally formatted diary entry. Use the microphone button to record directly on site.

Draft for review — not legal advice.

Site Notes

Formatted Site Diary

Enter your site notes and generate

Site Instruction Register

Issue a clear, numbered site instruction to a trade — speak or type it, attach a photo. If it’s a variation, it routes to a cost record and client sign-off. Locked once issued; edits create a new version.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.

Instruction Details

Site Instruction

Fill in the instruction and issue it — you’ll get a numbered Site Instruction, a register entry and a PDF.

Inspection Scheduler

Plan a project’s inspections, label surveyor-mandatory stages vs internal QA, and track each from Scheduled → Due → Overdue → Complete. Overdue items hit your Daily Supervisor.

Surveyor-mandatory stages are advisory. Under the Building Regulations 2018 (Vic), your Relevant Building Surveyor (RBS) determines which mandatory notification stages apply to your permit. This is a planning aid — confirm with your RBS. Not legal advice. Terms

Schedule an Inspection

Suggested Schedule

Pick a building class and tap “Suggest schedule”, or add an inspection directly.

RFI Generator

Type your question, get a numbered, professional RFI to send — with response tracking. A late response can be flagged toward an Extension of Time.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.

Raise an RFI

RFI

Fill in your question and issue it — you’ll get a numbered RFI, a register entry and a PDF.

Defect Photo AI

Turn a site photo into a draft defect record you review and send. The AI suggests wording for you to edit — it never makes a compliance, structural or legal determination.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.
You review every word before it’s issued. The AI only suggests a draft. It will only ever say “possible issue detected”, “further inspection recommended” or “review required” — never a breach, failure or non-compliance finding. Confirm anything serious with the responsible trade or a qualified professional. Terms

Site Photo & Details

🔒 Stored privately to your account as defect evidence — only you can view it (via a temporary secure link). Photos may show people; kept ~7 years and you can request deletion (Privacy Act 1988 / APPs).

Defect Notice

Add a photo and details, suggest a draft, edit it, then issue the defect record.

Quote Generator

Professional construction quotes with itemised cost breakdowns. VIC 2025 market rates.

Draft for review — not legal advice.

Job Details

Quote Document

Fill in job details to generate a quote
⚠️ Pricing Disclaimer: Estimates only. Verify all figures before presenting to clients.

Subcontractor Register

Track licences, insurance, White Cards and expiry dates. Get alerted before anything expires.

Add Subcontractor

Register 0 contractors
NameTradeContactLicenceLic. ExpiryInsurerIns. ExpiryWhite CardStatus
Loading your register…
⚠️ Note: Always verify licences at vba.vic.gov.au and WorkSafe VIC at worksafe.vic.gov.au.

Command Center

What needs you today — across every project. Four lanes, sorted by what costs you most if ignored.

Sign in to see your Command Center.

Daily Supervisor

Your morning compliance briefing — what needs attention today, across every project.

Sign in to see your daily briefing.

Projects

Create a project once, then attach every document you generate to it — one digital file per job.

Active project: None selected — documents you generate are linked to the active project.

Create a Project

Your Projects 0 projects
ProjectPrincipalAddressContract ValueStatus
Loading your projects…
⚠️ Note: Set a project as active to link generated documents to it. Archiving a project keeps its records and linked documents.
📊 Add a payment claim
For a progress/payment claim not generated in the Progress Claim Generator. It’s tracked in your Command Center money lane with its Security of Payment Act dates. Advisory — verify dates against your contract.

Subcontractor Brief

Generate a professional scope of works brief for any trade — ready to email or print before they arrive on site.

Brief Details

Subcontractor Brief

Fill in the details and generate a professional brief
⚠️ Note: Always confirm scope in writing with your subcontractor before works commence.

Extension of Time Notice

Generate a formal EOT notice referencing your contract clause. Protects you from liquidated damages for delays outside your control.

Draft for review — generated from user inputs. Not a completed claim. Not legal advice.

Delay Details

Extension of Time Notice

Describe the delay and generate your EOT notice
⚠️ Legal Notice: Serve EOT notices within the timeframe in your contract — it is the safest course. But note that under the Security of Payment Act 2002 (Vic) (as amended in 2026) a notice-based time-bar may be declared unfair and void where compliance was not reasonably possible or was unreasonably onerous — so a missed contractual deadline is not always fatal to a claim. Not legal advice. Indicative — verify against your contract and current legislation.

Practical Completion Checklist

Generate a tailored PC checklist by project type. Never miss an item at handover.

Project Details

Practical Completion Checklist

Select project type and generate your checklist
⚠️ Note: This checklist is a guide only. Always conduct a thorough physical inspection with the client present.

Client Email Drafter

Describe the situation — get a professionally worded email in three tones. Protects you legally while keeping the relationship.

Situation Details

Email Options

Describe the situation and get 3 professionally worded email options
⚠️ Legal Notice: Have a solicitor review emails involving payment disputes or termination. Not legal advice.

Plan Reader

Upload any construction plan PDF — AI reads and analyses the full set. Get a project summary, room breakdown, material quantities, NCC compliance check and cost estimate.

Upload Plan

📄

Drop your plan PDF here or click to browse

Architectural · Structural · Site · Electrical · Elevation · Full set

⚠️ Note: AI reads text, dimensions and annotations from the PDF. Quantities are indicative. Verify with a qualified quantity surveyor before ordering.

Trade Splitter

Upload one complete plan PDF — AI generates 9 separate trade packs in construction sequence. Each trade gets their own scope, quantities, cost estimate and SWMS hazards.

Upload Full Plan Set

📐

Drop your full plan PDF here or click to browse

Architectural + Structural + Services — upload full set as one PDF

⚠️ Note: Trade packs are AI-generated from plan annotations. Quantities are indicative. Confirm scope with each subcontractor before signing contracts.

Upgrade Your Plan

From document drafting to the full AI site supervisor and team access — pick what fits your business.

Free
$0/mo
  • ✓ Daily Supervisor + catches (1 project)
  • ✓ AI document tools (5/month)
  • ✓ PDF download
  • ✗ Unlimited documents & branding
  • ✗ The money loop & compliance gate
Starting plan
Supervisor
$39/mo
  • ✓ Unlimited AI documents
  • ✓ Your logo + no watermark, full history
  • ✓ Up to 3 projects
  • ✓ Plan Reader & Trade Splitter (fair-use)
Business
$179/mo
  • ✓ Everything in Builder
  • ✓ Team logins + multi-project portfolio
  • ✓ Custom brand colours + API
  • ✓ Unlimited Plan Reader & Trade Splitter

Document History

Every document you generate is saved to your account automatically. Open, re-print, or regenerate any of them — from any device you sign in on.